Groundworks in Great Eastern Road, Buckie
This is a groundworks, drainage, kerbing, slabbing, tarring and decorative balustrade job we carried out at The Rock Great Eastern Road Buckie in September 2022.
Groundworks, set out excavate and lay drains connected to existing drainage system, excavate foundations for new entrance plat, lay concrete foundation then build walls to desired level, excavate holes and erect galvanised posts for balustrade all set in concrete, excavate then lay drop kerbs and path edge stones, import type 1 hardcore, grade and compact, lay Caithness slate to new entrance plat, lay tar and erect galvanised balustrade.