Cog Icon signifying link to Admin page

John Robertson (North) Ltd

Pulling Together

Moir, Elgin

This was an extension in Elgin completed in 2002. This was a listed building and we had to match all materials exactly. We used local stone and lime to build the extension and used local craftsmen to manufacture timber fascias to match the existing.

^